Virtual Experience
banner-empire-centrum-desktop

When it comes to space

banner-empire-centrum-desktop

When it comes to space

  • Well planned dedicated Entrance Gates with Motorised Sliding MS Gate at the entry & exit
  • Truck Parking Area before the Entrance Gate at entry & exit
  • Two Tier Security Checks with Security Cabins at the entrance & throughout the premise
  • Boom Barriers at all entry points
  • Grading plot of 10 CBR Graded Compaction
  • Compound wall to externals of project plot
  • PQC Grade Concrete Roads
  • RCC Storm WAter drains along road side
  • RCC / Precast Covers
  • Paver Blocks at junction
  • Kerb stones
  • Speed breakers
  • Paved area of car & truck parking
  • Parking zones along road sides
  • Street light poles & lighting
  • Road Signage
  • Block/Plot Signage
  • Road Signalling System
  • Surveillance System
  • Hoardings & Advertising Poles
  • Lane & Diversion Markers
  • Street Light Poles & Lighting
  • Dedicated Water Storage at CUG, for Fire Fighting as per CFO Norms
  • CFO Certified, Industrial Piping & Distribution System for Fire Fighting for the entire project
  • Fire Hydrant, Hose Reel & Sand Buckets at required locations as per CFO norms
  • More than 10% of Open & Green areas
  • Well-planned areas for Infra Works with abundant open and green spaces
  • Landscaping works in overall project
  • Recreation area throughout the centrum
  • Dedicated supply of Electric Power – MSEB/Local Power Distributor
  • Industrial Class & Branded, Electrical Distribution System for entire project
  • Low maintenance & running costs
  • Dedicated Utility Duct / Corridors for services cables & pipes, throughout the Centrum
  • Hassle free maintenance of services related issues, without doing any digging
  • Supply of Water – From MIDC / Maharashtra Jal Pradhikaran
  • Central UG Water tank to store water for Domestic, fire, Flushing & Rainwater harvesting purposes.
  • Project Level GI Water Distribution System
  • Low maintenance & running costs
  • Rain Water Harvesting
  • Set up – Data Centre
  • Project Level Network & Distribution System
  • Set up – Solid Waste Collection & Treatment
  • Collection bins for Units & Common areas
  • Segregation of Bio-degradable waste
  • Collection of Sludge Water – from individual units
  • Sewage Treatment Plant at Project Site (470 Kld) X 2 Nos.
  • Project Level Flushing Water Distribution System
  • STP Plant Selection type for Low Maintenance & Running Costs

Schedule A Visit